Pharmaceutical Manufacturing Facility
Allergan Pharmaceuticals
Allegan Pharmaceuticals Westport campus is a state-of-the-art Manufacturing, Filling and Packaging operation, producing close to 800 million units of product on an annual basis. 

Imtech undertook the design, fabrication, installation and certification of two cooling water operations including; pre-treatment system to ensure the primary cooling water system met the required water quality specification and cooling plant skid. To ensure the installation caused as little impact on production at the facility as possible, our approach was to pre-fabricate the cooling system skids off site. This greatly improved delivery by shortening the programme and limiting risk to the plant.  

MI Slide 9

Pharmaceutical Manufacturing Facility

Allergan Pharmaceuticals

Allegan Pharmaceuticals Westport campus is a state-of-the-art Manufacturing, Filling and Packaging operation, producing close to 800 million units of product on an annual basis.

Imtech undertook the design, fabrication, installation and certification of two cooling water operations including; pre-treatment system to ensure the primary cooling water system met the required water quality specification and cooling plant skid. To ensure the installation caused as little impact on production at the facility as possible, our approach was to pre-fabricate the cooling system skids off site. This greatly improved delivery by shortening the programme and limiting risk to the plant.